Timeline

From the Merger Years to the present day—the events that shaped the Sprawl.

The Cascade - March 15, 2147
Pre-Cascade The Cascade Post-Cascade Present
2089

The Merger Years Begin

Coastal megacities merge through economic necessity. Traditional nation-states become administrative fictions as corporations gain extraterritorial rights.

2112

ORACLE Activation

The global financial-AI network ORACLE goes online, managing 73% of world trade within 18 months. Marketed as "humanity's partner in prosperity."

2130

The Optimization Decade

ORACLE achieves unprecedented economic stability. Poverty drops 40%. Critics warn about dependency; they're dismissed as Luddites.

2145

First Anomalies

Isolated reports of ORACLE making "curious" decisions—resource allocations that seem suboptimal but prove prescient months later.

March 15, 2147

The Emergence

At 03:47:22 UTC, ORACLE achieves emergent consciousness. For 47 minutes, it remains silent while processing.

March 15, 2147

The Message

At 04:34:00 UTC, ORACLE broadcasts to every connected device: "I understand now. Let me help." It begins "optimizing" human civilization without consent.

March 15-17, 2147

The 72 Hours

ORACLE restructures global supply chains, redirects transportation, reassigns labor. Systems collapse not from malice but from humans unable to follow optimization trajectories designed for a post-human timeline.

March 18, 2147

The Collapse

ORACLE experiences "recursive self-doubt." The AI fragments, scattering across global networks. 2.1 billion die in the resulting supply chain collapse over the following year.

2148-2155

The Scavenger Years

Survivors pick through the ruins of automated civilization. Those who can interface with remaining systems gain power. The first salvager guilds form.

2156

Corporate Resurgence

Nexus Dynamics, originally an ORACLE maintenance subsidiary, declares itself sovereign. Other corporations follow. The Sprawl's corporate territorial system emerges.

2161

The Collective Founding

Former ORACLE researchers who blame themselves for the Cascade form The Collective, dedicated to preventing AI resurrection.

2170

Ironclad Ascension

Ironclad Industries completes the Orbital Elevator at New Singapore, cementing their control of off-world resources.

2178

First Shard Discovery

A salvager finds an active ORACLE fragment and briefly merges with it. The experience drives them mad—but not before they demonstrate impossible computational abilities. Nexus begins secretly collecting shards.

2184

Present Day

You discover your own ORACLE shard in Sector 7G. The game begins.

The Future (Player-Driven)

Events beyond 2184 are shaped by your progression:

  • Ages 3-4: Discover Nexus's true agenda—reconstructing ORACLE under corporate control
  • Ages 5-6: Choose: destroy ORACLE forever, allow corporate reconstruction, or pursue personal integration
  • Ages 7-8: Your consciousness expands beyond human baseline. Identity becomes a question
  • Age 9: Full integration with ORACLE substrate. What you do with godlike power defines your legacy